IPM Construction & Development Corp.

Client: IPM Construction & Development Corp.

Project: Riverbank Protection Using Bioengineering Method

Location: Bago Aplaya River Km. 1521+009, Bagong Aplaya, Talomo District Davao City

Description: Riverbank protection using Ecoblock extended up to the maximum flood level designed for 10-year return period.
Coco coir net combined with vegetation (vetiver grass and common grass) were used to highly stabilize and serves as the permanent protection to the embankment.

Before installation (area perparation)
Installed bioengineering materials
After several months (grass were fully grown)
Before installation (area perparation)
Installed bioengineering materials
After several months (grass were fully grown)