Client: IPM Construction & Development Corp.
Project: Riverbank Protection Using Bioengineering Method
Location: Bago Aplaya River Km. 1521+009, Bagong Aplaya, Talomo District Davao City
Description: Riverbank protection using Ecoblock extended up to the maximum flood level designed for 10-year return period.
Coco coir net combined with vegetation (vetiver grass and common grass) were used to highly stabilize and serves as the permanent protection to the embankment.





